Exterior of the Smeaton Grange factory
← About

High-speed, robotic MMC build.

Our own manufacturing platform that turns design into precision-built components and modules: automated, digitally governed and ready to scale.

From design to install

Total traceability, from design to assembly.

Data follows each component from digital design to on-site installation, so what is designed is what gets built. Exact, controlled information travels all the way to site.

One shared digital model for every discipline.

Every project starts in a single collaborative BIM model. Architects, structural engineers and services designers all work on the same model, built in the open IFC standard and tailored to the group's own building components, so everyone is always looking at the latest version.

Each country has its own Technical Office that designs and calculates projects in the GIP software. Because the model already knows the component system, designs are buildable in the factory from the first sketch, not redesigned for manufacture afterwards.

What it controls: A single, shared digital model across all disciplines

  1. Architectural design

    Layouts and elevations drawn with the group's own library of panels, pods and modules.

  2. Engineering and calculation

    Structural and services engineering in licensed software adapted to the GIP system.

  3. Clash detection

    Automated design-collision and data checks find conflicts on screen, before anything is cut.

  4. Code compliance

    Australian and Spanish building-code requirements built into the model.

  5. Design freeze

    The coordinated design is locked and released to manufacturing.

One shared digital model for every discipline.

Every project starts in a single collaborative BIM model. Architects, structural engineers and services designers all work on the same model, built in the open IFC standard and tailored to the group's own building components, so everyone is always looking at the latest version.

Each country has its own Technical Office that designs and calculates projects in the GIP software. Because the model already knows the component system, designs are buildable in the factory from the first sketch, not redesigned for manufacture afterwards.

What it controls: A single, shared digital model across all disciplines

  1. Architectural design

    Layouts and elevations drawn with the group's own library of panels, pods and modules.

  2. Engineering and calculation

    Structural and services engineering in licensed software adapted to the GIP system.

  3. Clash detection

    Automated design-collision and data checks find conflicts on screen, before anything is cut.

  4. Code compliance

    Australian and Spanish building-code requirements built into the model.

  5. Design freeze

    The coordinated design is locked and released to manufacturing.

  1. CAD/CAM generation

    Machine files for cutting, forming and assembly created directly from the model.

  2. Factory nesting

    Cutting plans optimised to get the most from every board and coil, minimising offcuts.

  3. Bills of materials and cost

    Quantities and costs produced automatically from the design.

  4. Production scheduling

    Components sequenced to the order the site will need them.

  5. AI assistance

    AI agents draft plans, check data and build live dashboards for the team.

  1. Panel composition

    Fibre-cement or gypsum-fibre boards bonded to an insulated core, then stacked ready for cutting.

  2. Robotic cutting

    A robotic cell cuts, machines and labels each part from CAD/CAM instructions, separating waste automatically.

  3. Steel roll-forming

    Light-steel-frame profiles formed, punched and cut to the engineering data, then sequenced.

  4. 2D assembly

    Robotic positioning, then fixing, insulation, services and closure before each wall is raised upright.

  5. Finishing and 3D modules

    Panels finished or assembled into modules and pods, ready for dispatch.

  1. Sequenced delivery

    Stillages loaded in assembly order, matched to the site plan.

  2. Site readiness

    Foundations, services and civils completed while the factory builds.

  3. Identified assembly

    Barcode and QR codes confirm each component goes in the right place.

  4. Commissioning

    Services connected, tested and signed off.

  5. Handover

    Quality, compliance and warranty records handed to the owner and operator.

Digital twin

One digital thread, from model to building.

Watch a facade travel the GIP digital thread: modelled in BIM, framed in light steel, split into coded panels, nested for cutting to ±2 mm, then assembled in sequence.

  1. Model

  2. Frame

  3. 010203040506070809101112

    Code

  4. Nest

  5. 010203040506070809101112

    Assemble

Stage
1 · Model
Panels coded
32
Panels placed
32
Tolerance
±2 mm

One factory, six lines

An integrated factory: materials, assembly and 3D installation.

One factory runs six assembly lines, from panel production through to finished 3D modules.

One factory, six lines
Manufacture, assembly & install
±2 mm
Apartments / yr, one factory
3,000
Of materials recyclable
90%
On-site cutting waste
0

Build systems

Three systems. One production line.

Exploded light-steel wall panel: frame, insulation layer and board facingSYS-2D · PanelDrawing No. ZW-01 · Scale 1:50

01Panel (2D)

Room-sized volumetric module with open front showing floor, walls and ceilingSYS-3D · VolumetricDrawing No. ZW-02 · Scale 1:50

02Volumetric (3D)

Bathroom pod module set between flat wall panelsSYS-2D+3D · HybridDrawing No. ZW-03 · Scale 1:50

03Hybrid (2D + 3D)

Restricted · Partner access

Inside the Spanish platform.

From digital model to robotic panel line to a finished residential block: the GIP system at work in Spain.

Inside the Spanish platform.

Film locked · 2:25 · PIN required

Request access

No PIN? Request one through investor relations.

GIP · Con-tech

The software is the factory.

GIP is the group's construction-technology platform: design software, manufacturing execution and a standardised building system, proven on completed projects and owned by the group, running in every ZWHI factory.

  • One standardised building system across every factory
  • Barcode, QR and MES tracking on every component
gip-mes · production log
06:00:01DESIGNBIM model locked · rev C
06:00:14OPTIMISEnesting complete · waste minimised
06:01:02CAD/CAMmachine files generated
06:12:40PRODUCErobotic framing · line 1
09:30:05TRACKpanels barcoded · MES synced
14:00:00DELIVERsequenced kit dispatched